Engineering preparation
The park is being designed from scratch with a full set of utility networks, roads and facilities — turnkey for residents.
Building structure
Park facilities (99,502 m²)
Industrial
80 640 m²
Production buildings
Warehouse
9 216 m²
Storage & logistics
Administrative
5 280 m²
Office space
Technical
4 366 m²
Engineering facilities
Fully centralised
The managing company fully provides connection and maintenance of networks — residents receive a ready-to-operate site.
Electricity
Connection to high-voltage grids, option for on-site generation for autonomous power.
Gas
Main gas pipeline with sufficient capacity for industrial facilities.
Water
Drinking and process water, sewerage, local treatment facilities for industrial effluents.
Roads
Paved internal roads, parking, landscaped common areas.
Connectivity
Fibre internet, telephony, digital infrastructure for R&D and offices.
Waste
Waste-treatment facilities, sorting and recycling — to eco-standards.
UAH 912 million total capex
| Cost item | Amount, UAH |
|---|---|
| Earthworks, vertical planning | 27 165 432 |
| Engineering design | 32 912 319 |
| Networks (water, gas, electricity) | 123 421 196 |
| New facility construction | 617 105 979 |
| Roads & landscaping, infrastructure | 112 322 228 |
| Total | 912 927 153 |
Estimates were prepared by comparative analysis based on similar technical conditions of other industrial parks.
Review the investment package
Detailed financial indicators, funding sources and expected returns of the project.
Investment